X
Donghong Group Co., LTD
CN EN
Company News

Company News

Industry Updates

Industry Updates

Social Responsibility

Social Responsibility

2025.05.28

Warmly Celebrate the Successful Launch of the First Vessel "WANHANG HENGYUAN" in the Donghong 3300TEU Series Container Ship Project

Warmly Celebrate the Successful Launch of the First Vessel "WANHANG HENGYUAN" in the Donghong 3300TEU Series Container Ship Project

Designed by the Shanghai Merchant Ship Design and Research Institute (SDARI), this vessel is a single-screw, single slow-speed diesel engine-driven, double-hull, single-deck, aft-engine international inter-coastal container ship optimized for specific bay region routes.

The ship features:

6 cargo holds and 11 hatch openings

Engine room, forepeak tank, aft void space

Emergency fire pump room in the bow

8 watertight bulkheads dividing the hull

Double-side shell and double-bottom structure in the cargo hold area

Lifting-off type hatch covers for each hatch opening

Container Capacity:

Total: 3316 TEU

On Deck: 1578 TEU (including capacity for 200 FEU - Forty-foot Equivalent Units)

In Holds: 1738 TEU

Capabilities:

Can carry Class 1-9 packaged dangerous goods (IMDG Code compliant)

Navigation Area: R1 Zone 

Principal Dimensions and Characteristics:

Parameter

Value

Length Overall   (Loa)

197.0 m

Length Between   Perpendiculars (Lpp)

194.0 m

Moulded Breadth   (B)

34.8 m

Moulded Depth (D)

19.2 m

Design Draft (d)

12.5 m

Scantling Draft   (ds)

13.0 m

Deadweight (DWT)   @ Design Draft

~57,800 tonnes

Service Speed

~14.5 knots

Gross Tonnage   (GT)

~39,400

Net Tonnage (NT)

~22,100

Main Engine: 1 set × 8,400 kW × 90 rpm

Main Generators: 3 sets × 600 kW × 750 rpm

Harbor Generator: 1 set × 400 kW × 1000 rpm

Emergency Diesel Generator: 1 set × 150 kW × 1500 rpm

Shaft Generator: 1 set × 600 kW

3


< Prev
2024.10.04

Great News!

> Next
2025.06.14

Warmly Celebrate the Successful Launch of the Second Vessel "JIAHUA ZHOUSHAN" in the Donghong 3300TEU Series Container Ship Project

2024.12.23

[Good News] Another 500T Gantry Crane Successfully Installed

Following the commissioning of two 600-ton gantry cranes last year and the 700-ton and 500-ton gantr...

2024.12.18

[Good News] Complete Upgrade of CNC Equipment

After more than one month of installation and commissioning, the company's 7 sets of CNC cutting...

Donghong Group Co., LTD Follow Donghong

Copyright © 2025 Donghong Group Co., LTD All Rights Reserved.